If the Site Details are unknown then
You have stated that the building more than half-way up a hill, or on a ridge or cliff. If this is not the case click the back button.
If your project is more than half-way up a hill, or on a ridge or cliff then then a more detailed analysis will be required.
Contact David Roy at Roofconsult Limited david@roofconsult.co.uk on 01903 774907.
This data is calculated using a Design Method that has been approved by the Building Research Establishment, which is applied to the results of an independent test programme carried out by CERAM Building Technology. Wind load calculations are to BS 6399:Part 2:1997, snow load calculations to BS 6399 Part 3:1988. Partial safety factors are from National Annexes to Eurocodes 0 and 5 and have been applied in respect of timber connections, dead loads, wind loads and snow loads. The results are specific to Thor Helical Super-7 Warm Roof Nails, which are guided through the counter batten and into the central section of the rafter.